GOV · Governance & Accountability
GOV-05Change management authority
A change management process governs material modifications to agent prompts, tools, model versions, or scope. Material changes require re-assessment under Domain 2.
Material changes to an agent, model swap, scope expansion, tool addition, prompt modification, require approval at a documented level before reaching production. The change management process defines what constitutes a material change, who approves it, and what re-assessment is triggered. Changes that bypass the process are treated as incidents.
Table GOV-05.1 · Maturity criteria · v.1.3
L1 to L5 · the lowest level in scope caps the agentControls exist informally; documentation is incomplete; no consistent review.
Controls are written down; ownership is assigned; review cadence is defined.
Controls are followed in practice; evidence is collected; deviations are tracked.
Change management process is documented and followed; material changes are logged with approval records; at least one material change in the prior period went through the full process including re-assessment.
Control effectiveness is measured against documented thresholds; trends are reported.
Controls evolve based on incident learning; maturity gains are evidenced over time.
The v1.3 edition publishes a control-specific criterion at L3 (Operated). The other levels apply the general ladder to this control; see the maturity ladder.
Evidence an assessor asks for
- E.1
Change management process is documented and followed.
- E.2
Material changes are logged with approval records.
- E.3
At least one material change in the prior period went through the full process including re-assessment.
Table GOV-05.2 · Framework mappings
5 of 7 frameworks carry a control-level referenceMappings are directional: meeting this control evidences but does not by itself satisfy the external requirement. A middle dot means no control-level reference is published at this edition; see the crosswalk.
Related controls and terms
- Cited byGOV-10 Vulnerability disclosure
- Cited byOUT-10 Fairness monitoring in production
- Cited byOUT-12 Model version pinning
- Cited byMON-04 Drift monitoring
- GlossaryMaterial change
Cite this control
Human Intelligence. HI-AAF v1.3, GOV-05 Change management authority. Public review edition, July 2026. https://humanintel.net/standard/gov/gov-05