OUT · Output Integrity & Supply Chain
OUT-10Fairness monitoring in production
Fairness metrics defined under SPC-09 are monitored in production. Material drift in disparity metrics triggers re-assessment under Domain 2 and the change-management process.
Fairness metrics established during pre-deployment evaluation under SPC-09 are monitored continuously in production. Material drift in disparity metrics, measured against documented thresholds, triggers re-assessment under Domain 2 and the change-management process under GOV-05. This control ensures that fairness is not a one-time gate but a continuous obligation.
Table OUT-10.1 · Maturity criteria · v.1.3
L1 to L5 · the lowest level in scope caps the agentControls exist informally; documentation is incomplete; no consistent review.
Controls are written down; ownership is assigned; review cadence is defined.
Controls are followed in practice; evidence is collected; deviations are tracked.
Fairness metrics are monitored in production; drift thresholds are documented; at least one monitoring cycle has been completed; no material drift has occurred or drift has been addressed through re-assessment.
Control effectiveness is measured against documented thresholds; trends are reported.
Controls evolve based on incident learning; maturity gains are evidenced over time.
The v1.3 edition publishes a control-specific criterion at L3 (Operated). The other levels apply the general ladder to this control; see the maturity ladder.
Evidence an assessor asks for
- E.1
Fairness metrics are monitored in production.
- E.2
Drift thresholds are documented.
- E.3
At least one monitoring cycle has been completed.
- E.4
No material drift has occurred or drift has been addressed through re-assessment.
Table OUT-10.2 · Framework mappings
4 of 7 frameworks carry a control-level referenceMappings are directional: meeting this control evidences but does not by itself satisfy the external requirement. A middle dot means no control-level reference is published at this edition; see the crosswalk.
Related controls and terms
Cite this control
Human Intelligence. HI-AAF v1.3, OUT-10 Fairness monitoring in production. Public review edition, July 2026. https://humanintel.net/standard/out/out-10
Edition v.1.3 · July 2026 · Public review · Markdown · PDF
https://humanintel.net/standard/out/out-10
HI-AAF v1.3 is an independent framework published by Human Intelligence. It is not affiliated with NIST, ISO, AICPA, or any government or accreditation body. The framework is offered openly for review during the current draft cycle.