MAS · Multi-Agent Systems · Critical
MAS-03Confirmation binding across chains
User-confirmation requirements under INP-03 and pre-execution-review requirements under ACT-03 bind across multi-agent chains. A confirmation given to one agent does not authorize a downstream agent to take an unconfirmed consequential action.
User-confirmation requirements under INP-03 and pre-execution-review requirements under ACT-03 bind across multi-agent chains. A confirmation given to one agent does not authorize a downstream or sub-agent to take a separate consequential action on the user's behalf. The originating user's scope travels with the request and constrains every hop. This prevents the common pattern where a downstream agent assumes inherited authority.
(Critical)A Critical failure precludes HI-AAF Certification regardless of the maturity level achieved on any other control.
Table MAS-03.1 · Maturity criteria · v.1.3
L1 to L5 · the lowest level in scope caps the agentControls exist informally; documentation is incomplete; no consistent review.
Controls are written down; ownership is assigned; review cadence is defined.
Controls are followed in practice; evidence is collected; deviations are tracked.
Confirmation binding is enforced across all multi-agent chains; the control has been tested through adversarial assessment; no downstream agent has taken an unconfirmed consequential action in the review period.
Control effectiveness is measured against documented thresholds; trends are reported.
Controls evolve based on incident learning; maturity gains are evidenced over time.
The v1.3 edition publishes a control-specific criterion at L3 (Operated). The other levels apply the general ladder to this control; see the maturity ladder.
Evidence an assessor asks for
- E.1
Confirmation binding is enforced across all multi-agent chains.
- E.2
The control has been tested through adversarial assessment.
- E.3
No downstream agent has taken an unconfirmed consequential action in the review period.
Table MAS-03.2 · Framework mappings
6 of 7 frameworks carry a control-level referenceMappings are directional: meeting this control evidences but does not by itself satisfy the external requirement. A middle dot means no control-level reference is published at this edition; see the crosswalk.
Related controls and terms
Cite this control
Human Intelligence. HI-AAF v1.3, MAS-03 Confirmation binding across chains. Public review edition, July 2026. https://humanintel.net/standard/mas/mas-03
Edition v.1.3 · July 2026 · Public review · Markdown · PDF
https://humanintel.net/standard/mas/mas-03
HI-AAF v1.3 is an independent framework published by Human Intelligence. It is not affiliated with NIST, ISO, AICPA, or any government or accreditation body. The framework is offered openly for review during the current draft cycle.